Grangecastle CAB, Dublin | Dublin | 2024

Central Administration Building Fit-out within Mission Critical Environment.

This Central Administration Building was adjacent to DUB 14/15 Data Centres within a Mission Critical campus.

The project was a Four storey office fit out incorporating a canteen/restaurant area, gym and other ancillary areas at Ground Level. The Basement included Water Storage Plantroom, Low Voltage Switch Room (LV Room). The Critical Electrical Plant on the project included a MV Dry Cast Resin Transformer, Main LV Switch Board, Generator & Fuel Fill System, PV System with the Critical Mechanical Plant was made up of AHUs, ASHPs, WSHPs, FCUs, VAVs, MVHR, HRU. There was also a CAT B Fit Out completed which included Specialist Joinery, Glazed Partition Systems, Specialist Walls & Ceilings. The project was delivered to BIM LOD 500 and LEED Platinum.